Choose the Right Level of Control for Your Investment
Every construction project carries different levels of risk depending on its size, complexity, and current stage.
QMAC offers flexible monitoring packages designed to give investors the right amount of oversight at the right time. Our packages are based on reporting frequency, on-site presence, and risk exposure —not generic checklists.
Monitoring Packages
Maximum control for active
construction phases

This package is recommended for projects during structural works, major installations, or critical execution stages.
What's included:
-
Weekly on-site inspections
-
Detailed progress verification
-
Material and workmanship quality checks
-
Budget alignment snapshot
-
Timeline performance review
-
Photo-documented findings
-
Risk identification and corrective recommendations
Best for:
Active construction, high-value projects, or investors seeking close oversight.
Starting from: On request (Pricing depends on project size, location, and scope)
Biweekly Monitoring (Every 15 Days)
Balanced oversight with
cost efficiency

Ideal for projects that require consistent monitoring without weekly site presence.
What's included:
-
On-site inspections every 15 days
-
Structured inspection reports
-
Quality and workmanship assessment
-
Progress and schedule checkpoints
-
Photo documentation
-
Risk alerts and recommendations
Best for:
Mid-stage construction or stable project phases.
Starting from: On request
Monthly Monitoring
High-level control for
lower-risk stages

Designed for projects in slower phases or nearing completion.
What's included:
-
Monthly on-site inspection
-
Summary progress and quality report
-
Key risk identification
-
Budget and timeline overview
-
Photo documentation
Best for:
Finishing stages, renovation projects, or lower-risk developments.
Starting from: On request
What Makes QMAC Packages Different
-
Independent by design
We do not work for contractors, developers, or suppliers. -
Evidence-based reporting
Every report includes dated photos and documented findings. -
Investor-first focus
Reports are written for decision-making, not technical jargon. -
Early risk detection
Issues are flagged before they turn into delays or cost overruns.
How Pricing Is Determined
- Final pricing is based on:
- Project size and complexity
- Construction stage
- Site location in Bali
- Required reporting frequency
- This ensures fair, transparent pricing aligned with actual project needs.
Optional Add-On Services
For investors who require expert input beyond monitoring and reporting, QMAC offers optional advisory services based on architectural and engineering expertise originating from MacCreative.
These services are independent, non-obligatory, and fully aligned with investor interests.
A / Architectural Design Advisory (Interior & Exterior)

Independent review and guidance on architectural and interior design decisions to ensure functionality, cost efficiency, and long-term investment value.
Includes:
A1/ Review of architectural and interior concepts
A2/ Design efficiency and usability feedback
A3/ Alignment with budget and construction realities
A4/ Recommendations to improve rental or resale value
M/ Material Selection Advisory
Material Sourcing & Supplier Advisory


Objective guidance on material choices to balance quality, durability, cost, and availability.
Includes:
M1/ Evaluation of proposed materials
M2/ Quality vs. cost comparison
M3/ Suitability for Bali climate and usage
M4/ Identification of unnecessary cost escalations
Independent advisory support in evaluating and selecting suppliers and subcontractors.
Includes:
MS1/ Supplier comparison and vetting
MS2/ Quality and reliability assessment
MS3/ Price benchmarking
MS4/ Risk identification before procurement
- 7/24 Emergency site visit
- CMA/ Contractor or consultant meeting attendance
- MAS/ Material approval support
- TOR/ Technical opinion reports
- Pi/ Pre-handover inspection
- RABP/ Risk assessment before next construction phase

Not Sure Which Package Is Right for You?
Choosing the wrong level of oversight can be costly.
Let us review your project and recommend the most effective monitoring solution — with no obligation.

QMAC — Independent Construction Audit & Site Monitoring in Bali.
Protecting your investment through clarity, control, and confidence