Strategic Quality,

Risk & Investment Control 


At QMAC, we do not sell hours or inspections.
We protect investment value, time, and decision quality.

Our services are structured into clear packages — from simple site visibility to full investor protection — allowing you to choose the exact level of control your project requires.



PACKAGES  


Best for

Overseas investors

Small or early-stage projects

First-time QMAC clients

"Let's try once" approach

Scope

  • One site visit (visual observation only)

  • Photo & short video documentation

  • Basic site status description

  • Simple summary report (PDF)

PACK1 QMACTP

ENTRY / TRIAL PACKAGE  

Remote Site View & Basic Reporting

A low-commitment entry package designed to give investors visibility and peace of mind.

Purpose
To provide a simple visual overview of an active construction site for investors who want to see progress without engaging in full technical supervision.

Not Included

  • Technical approval

  • Quality control

  • Design or engineering evaluation

  • Contractor instruction

Fee

USD 350 – 750

Upgradeable at any time to higher QMAC packages.



PACK2 / HIGH END

QMAC INVEST SHIELD 


Full Investor Protection & Delivery Assurance Program

The highest level of technical, financial, and delivery protection for high-value real estate investments.

Purpose

QMAC Invest Shield is designed to fully protect the investor's capital, timeline, and asset quality throughout the entire lifecycle of a construction project — from early-stage decisions to final delivery.

This package provides maximum control, transparency, and accountability, acting as the investor's independent technical authority on the ground.

BEST FOR

  • Foreign investors & international partners

  • High-value villa, hotel, resort, and mixed-use developments

  • Multi-unit or phased projects

  • Investors requiring board-level reporting and full transparency



QMAC INVEST SHIELD SCOPE OF SERVICES 

 End-to-End Technical Supervision

  • Continuous oversight from pre-construction to handover

  • Independent technical authority on behalf of the investor

  • Early identification of technical, material, and execution risks


Contractor Performance & Compliance Monitoring

  • Evaluation of contractor execution quality

  • Compliance checks with approved drawings and specifications

  • Identification of workmanship risks and corrective recommendations


Reporting & Transparency (Board-Level)

  • Structured monthly technical & financial reports

  • Visual documentation (photos, diagrams, progress summaries)

  • Clear risk flags: OK / Attention / Critical

  • Reports suitable for partners, banks, or investment committees

Budget Control & Financial Protection

  • Verification of cost structures and technical budgets

  • Payment milestone validation

  • Progress vs. payment alignment checks

  • Early warning on cost overruns and budget deviations

No payment is recommended without verified progress.

Integrated Technical Coordination

  • Coordination between architectural, structural, mechanical, and electrical disciplines
  • Clash detection and superposition control
  • Feasibility validation of design decisions before site execution


Handover & Completion Validation

  • Final inspection and readiness assessment

  • Punch-list verification

  • Completion compliance confirmation

  • Technical readiness for operation or rental

Timeline & Delivery Assurance

  • Master schedule validation
  • Monitoring of critical path activities
  • Delay risk identification and mitigation strategies
  • Contractor performance tracking against timeline commitments


Quality Control & Material Compliance

  • On-site quality inspections
  • Material conformity checks against approved standards
  • Long-term durability and lifecycle performance assessment


Investor Representation (Non-Executive)

  • QMAC acts as the investor's technical representative

  • Participation in key coordination and decision meetings

  • Clear documentation of decisions, risks, and responsibilities

  • No conflict of interest with designers or contractors



VALUE FOR THE INVESTOR

✔ Capital protection
✔ Predictable delivery
✔ Reduced disputes
✔ Controlled decision-making
✔ Transparent reporting
✔ Peace of mind

QMAC Invest Shield allows investors to focus on returns — not construction problems.

Full Investor Protection & Delivery Assurance Program

Duration
Project-based engagement
• Typically 6 – 24 months, depending on project scale

Timing
• Starts before construction kickoff
• Covers all critical project phases:

  • Pre-construction

  • Construction

  • Final completion & handover

Flexibility
• Can be phased or extended for multi-stage developments

FEE STRUCTURE

  • 2% – 4% of total project value

  • Minimum engagement: USD 15,000 – 25,000

  • Tailored proposals available for large or multi-phase developments


"Most investment risks in Bali are created before construction begins." 

Rapid growth creates opportunity — but without strategic control, it also creates costly mistakes.


PACK3 / QMAC START



Initial Risk & Technical Review

Purpose

A fast professional opinion before financial or contractual commitment.

Scope

Preliminary project & contractor review

Technical contract reading (non-legal)

Key risk identification

One online consultation

Summary risk report

Fee

USD 1,500 – 3,000

Duration

Short-term engagement
• Valid for 7–14 days

Timing
• Before land purchase finalization
• Before signing construction contracts
• At early project planning stage

Outcome
• Risk assessment completed before any irreversible decision

PACK4 / QMAC PROJECT DNA 



Investment Foundation & Strategic Start

"Because the biggest mistakes are made before construction begins."


Purpose

To ensure the land, concept, architectural direction, materials, and timeline are aligned with the investment goal before execution

Scope

Monthly technical reports

Photo & report documentation

Progress validation

Quality checklist verification

Periodic site inspection

  • Fee

    USD 5.000 – 12.000

  • Active Construction Quality Control

    Duration

    Monthly subscription
    • Minimum engagement: 3 months

    Timing
    • Starts with construction kickoff
    • Continues through structural and finishing phases

    Typical Use
    • Medium-scale villa, hotel, or commercial projects

    PACK5 / QMAC CONTROL 



    Active Construction Quality Control 

    Purpose

    To protect construction quality and progress through independent monitoring. 

    Scope

    QMAC Project DNA Investment Report (PDF)

    Realistic development timeline

    Insulation & climate performance approach

    High-level material strategy

    Structural system guidance

    Architectural style & concept alignment

    Development potential & zoning risk review

    Land & location suitability analysis


    Fee

    USD 2,500 – 6,000 / month

    (Minimum 3 months)

    Investment Foundation & Strategic Start

    Duration
    2 – 4 weeks, depending on project size

    Timing
    Before construction begins
    • Ideally before final architectural design approval
    • Before contractor selection

    Outcome
    • Clear investment roadmap prior to execution

    Monitoring Packages


    Maximum control for active

    construction phases


    This package is recommended for projects during structural works, major installations, or critical execution stages.

    What's included:

    • Weekly on-site inspections

    • Detailed progress verification

    • Material and workmanship quality checks

    • Budget alignment snapshot

    • Timeline performance review

    • Photo-documented findings

    • Risk identification and corrective recommendations

    Best for:
    Active construction, high-value projects, or investors seeking close oversight.

    Starting from: On request (Pricing depends on project size, location, and scope)

    Biweekly Monitoring (Every 15 Days) 


    Balanced oversight with

    cost efficiency 


    Ideal for projects that require consistent monitoring without weekly site presence.

    What's included:

    • On-site inspections every 15 days

    • Structured inspection reports

    • Quality and workmanship assessment

    • Progress and schedule checkpoints

    • Photo documentation

    • Risk alerts and recommendations

    Best for:
    Mid-stage construction or stable project phases.

    Starting from: On request

    Monthly Monitoring 


    High-level control for 

    lower-risk stages


    Designed for projects in slower phases or nearing completion.

    What's included:

    • Monthly on-site inspection

    • Summary progress and quality report

    • Key risk identification

    • Budget and timeline overview

    • Photo documentation

    Best for:
    Finishing stages, renovation projects, or lower-risk developments.

    Starting from: On request

    What Makes QMAC Packages Different

    • Independent by design
      We do not work for contractors, developers, or suppliers.

    • Evidence-based reporting
      Every report includes dated photos and documented findings.

    • Investor-first focus
      Reports are written for decision-making, not technical jargon.

    • Early risk detection
      Issues are flagged before they turn into delays or cost overruns.

    How Pricing Is Determined

    • Final pricing is based on:

    • Project size and complexity
    • Construction stage
    • Site location in Bali
    • Required reporting frequency
    • This ensures fair, transparent pricing aligned with actual project needs.

    STRATEGIC ADVISORY MODULES (ADD-ONS)

    Multi-Discipline Coordination & Investor Representation  (PACK / MDCI)


    Purpose


    To align architects, engineers, and contractors under one independent technical authority. SUPERPOSE

    Scope

    • Cross-discipline technical coordination

    • Clash & superposition prevention

    • Feasibility control of design decisions

    • Structured coordination meetings

    • Investor representation (non-executive)

    • Responsibility boundary clarification

    Fee

    USD 2,500 – 6,000 / month

    or

    1% – 2% of project value

    (Minimum USD 7,500 – 10,000)

    ADDITIONAL ADVISORY MODULES

    Module Description Fee Range

    For investors who require expert input beyond monitoring and reporting, QMAC offers optional advisory services based on architectural and engineering expertise originating from MacCreative.


    These services are independent, non-obligatory, and fully aligned with investor interests.

    QMAC/M/ AAD

    Architectural Advisory Design decision validation 

    (Interior & Exterior)

    Independent review and guidance on architectural and interior design decisions to ensure functionality, cost efficiency, and long-term investment value.

    Includes:

    A1/ Review of architectural and interior concepts

    A2/ Design efficiency and usability feedback

    A3/ Alignment with budget and construction realities

    A4/ Recommendations to improve rental or resale value

    USD 2,000 – 5,000

    QMAC/M/ MSA 

    Material Selection Advisory Durability & lifecycle cost 

    Objective guidance on material choices to balance quality, durability, cost, and availability.

    Includes:

    M1/ Evaluation of proposed materials

    M2/ Quality vs. cost comparison

    M3/ Suitability for Bali climate and usage

    M4/ Identification of unnecessary cost escalations

    USD 1,500 – 4,000



    QMAC/M/ IAC 

    Insulation Advisory Climate & energy performance

    USD 1,000 – 3,000

    QMAC/M/ TSR

    Technical Superposition Review Clash prevention 

    USD 3,000 – 8,000

    QMAC/M/ TSAD

    Timeline & Scheduling Advisory Delay risk reduction

    USD 1,000 – 3,000 



    QMAC INTEGRATED DELIVERY CONTROL

    Multi-Discipline Coordination & Investor Representation

    Duration
    Monthly engagement
    • Minimum: 3 months

    Timing
    • Starts once multiple parties (architect, engineer, contractor) are engaged
    • Continues through active coordination phases

    QMAC does not replace architects, engineers, or contractors.
    QMAC operates as an independent quality, coordination, and investment protection authority, supported by MacCreative Group's 19+ years of architectural and engineering expertise

    ADDITIONAL ADVISORY MODULES

    Duration
    1 – 3 weeks per module

    Timing
    • Activated at specific decision points
    • Can be used independently or alongside core packages

    VISUAL SUGGESTION (WEB)

    Bu bölümü Pricing sayfasında paketlerin altına veya ayrı bir "Timeline & Duration" bölümü olarak eklemeni öneririm.

    Örnek kısa cümle (web için):

    QMAC services are activated at different stages of your project — from land selection to final delivery.

    • 7/24 Emergency site visit
    • CMA/ Contractor or consultant meeting attendance
    • MAS/ Material approval support
    • TOR/ Technical opinion reports
    • Pi/ Pre-handover inspection
    • RABP/ Risk assessment before next construction phase

    Not Sure Which Package Is Right for You?

    Choosing the wrong level of oversight can be costly.

    Let us review your project and recommend the most effective monitoring solution — with no obligation.

    QMAC — Independent Construction Audit & Site Monitoring in Bali.
    Protecting your investment through clarity, control, and confidence