Strategic Quality,
Risk & Investment Control
At QMAC, we do not sell hours or inspections.
We protect investment value, time, and decision quality.
Our services are structured into clear packages — from simple site visibility to full investor protection — allowing you to choose the exact level of control your project requires.




PACKAGES

Best for
Overseas investors
Small or early-stage projects
First-time QMAC clients
"Let's try once" approach
Scope
-
One site visit (visual observation only)
-
Photo & short video documentation
-
Basic site status description
-
Simple summary report (PDF)
PACK1 / QMACTP
ENTRY / TRIAL PACKAGE
Remote Site View & Basic Reporting
A low-commitment entry package designed to give investors visibility and peace of mind.
Purpose
To provide a simple visual overview of an active construction site for investors who want to see progress without engaging in full technical supervision.
Not Included
-
Technical approval
-
Quality control
-
Design or engineering evaluation
-
Contractor instruction
Fee
USD 350 – 750
Upgradeable at any time to higher QMAC packages.




PACK2 / HIGH END
QMAC INVEST SHIELD
Full Investor Protection & Delivery Assurance Program
The highest level of technical, financial, and delivery protection for high-value real estate investments.
Purpose
QMAC Invest Shield is designed to fully protect the investor's capital, timeline, and asset quality throughout the entire lifecycle of a construction project — from early-stage decisions to final delivery.
This package provides maximum control, transparency, and accountability, acting as the investor's independent technical authority on the ground.
BEST FOR
-
Foreign investors & international partners
-
High-value villa, hotel, resort, and mixed-use developments
-
Multi-unit or phased projects
-
Investors requiring board-level reporting and full transparency
QMAC INVEST SHIELD SCOPE OF SERVICES
End-to-End Technical Supervision
-
Continuous oversight from pre-construction to handover
-
Independent technical authority on behalf of the investor
-
Early identification of technical, material, and execution risks
Contractor Performance & Compliance Monitoring
-
Evaluation of contractor execution quality
-
Compliance checks with approved drawings and specifications
-
Identification of workmanship risks and corrective recommendations
Reporting & Transparency (Board-Level)
-
Structured monthly technical & financial reports
-
Visual documentation (photos, diagrams, progress summaries)
-
Clear risk flags: OK / Attention / Critical
-
Reports suitable for partners, banks, or investment committees
Budget Control & Financial Protection
-
Verification of cost structures and technical budgets
-
Payment milestone validation
-
Progress vs. payment alignment checks
-
Early warning on cost overruns and budget deviations
No payment is recommended without verified progress.
Integrated Technical Coordination
- Coordination between architectural, structural, mechanical, and electrical disciplines
- Clash detection and superposition control
- Feasibility validation of design decisions before site execution
Handover & Completion Validation
-
Final inspection and readiness assessment
-
Punch-list verification
-
Completion compliance confirmation
-
Technical readiness for operation or rental
Timeline & Delivery Assurance
- Master schedule validation
- Monitoring of critical path activities
- Delay risk identification and mitigation strategies
- Contractor performance tracking against timeline commitments
Quality Control & Material Compliance
- On-site quality inspections
- Material conformity checks against approved standards
- Long-term durability and lifecycle performance assessment
Investor Representation (Non-Executive)
-
QMAC acts as the investor's technical representative
-
Participation in key coordination and decision meetings
-
Clear documentation of decisions, risks, and responsibilities
-
No conflict of interest with designers or contractors



VALUE FOR THE INVESTOR
✔ Capital protection
✔ Predictable delivery
✔ Reduced disputes
✔ Controlled decision-making
✔ Transparent reporting
✔ Peace of mind
QMAC Invest Shield allows investors to focus on returns — not construction problems.
Full Investor Protection & Delivery Assurance Program
Duration
• Project-based engagement
• Typically 6 – 24 months, depending on project scale
Timing
• Starts before construction kickoff
• Covers all critical project phases:
-
Pre-construction
-
Construction
-
Final completion & handover
Flexibility
• Can be phased or extended for multi-stage developments
FEE STRUCTURE
2% – 4% of total project value
Minimum engagement: USD 15,000 – 25,000
Tailored proposals available for large or multi-phase developments

"Most investment risks in Bali are created before construction begins."
Rapid growth creates opportunity — but without strategic control, it also creates costly mistakes.
PACK3 / QMAC START

Initial Risk & Technical Review
Purpose
A fast professional opinion before financial or contractual commitment.
Scope
Preliminary project & contractor review
Technical contract reading (non-legal)
Key risk identification
One online consultation
Summary risk report
Fee
USD 1,500 – 3,000
Duration
• Short-term engagement
• Valid for 7–14 days
Timing
• Before land purchase finalization
• Before signing construction contracts
• At early project planning stage
Outcome
• Risk assessment completed before any irreversible decision
PACK4 / QMAC PROJECT DNA

Investment Foundation & Strategic Start
"Because the biggest mistakes are made before construction begins."
Purpose
To ensure the land, concept, architectural direction, materials, and timeline are aligned with the investment goal before execution.
Scope
Monthly technical reports
Photo & report documentation
Progress validation
Quality checklist verification
Periodic site inspection
Fee
USD 5.000 – 12.000
Active Construction Quality Control
Duration
• Monthly subscription
• Minimum engagement: 3 months
Timing
• Starts with construction kickoff
• Continues through structural and finishing phases
Typical Use
• Medium-scale villa, hotel, or commercial projects
PACK5 / QMAC CONTROL

Active Construction Quality Control
Purpose
To protect construction quality and progress through independent monitoring.
Scope
QMAC Project DNA Investment Report (PDF)
Realistic development timeline
Insulation & climate performance approach
High-level material strategy
Structural system guidance
Architectural style & concept alignment
Development potential & zoning risk review
Land & location suitability analysis
Fee
USD 2,500 – 6,000 / month
(Minimum 3 months)Investment Foundation & Strategic Start
Duration
• 2 – 4 weeks, depending on project size
Timing
• Before construction begins
• Ideally before final architectural design approval
• Before contractor selection
Outcome
• Clear investment roadmap prior to execution
Monitoring Packages
Maximum control for active
construction phases

This package is recommended for projects during structural works, major installations, or critical execution stages.
What's included:
-
Weekly on-site inspections
-
Detailed progress verification
-
Material and workmanship quality checks
-
Budget alignment snapshot
-
Timeline performance review
-
Photo-documented findings
-
Risk identification and corrective recommendations
Best for:
Active construction, high-value projects, or investors seeking close oversight.
Starting from: On request (Pricing depends on project size, location, and scope)
Biweekly Monitoring (Every 15 Days)
Balanced oversight with
cost efficiency

Ideal for projects that require consistent monitoring without weekly site presence.
What's included:
-
On-site inspections every 15 days
-
Structured inspection reports
-
Quality and workmanship assessment
-
Progress and schedule checkpoints
-
Photo documentation
-
Risk alerts and recommendations
Best for:
Mid-stage construction or stable project phases.
Starting from: On request
Monthly Monitoring
High-level control for
lower-risk stages

Designed for projects in slower phases or nearing completion.
What's included:
-
Monthly on-site inspection
-
Summary progress and quality report
-
Key risk identification
-
Budget and timeline overview
-
Photo documentation
Best for:
Finishing stages, renovation projects, or lower-risk developments.
Starting from: On request
What Makes QMAC Packages Different
-
Independent by design
We do not work for contractors, developers, or suppliers. -
Evidence-based reporting
Every report includes dated photos and documented findings. -
Investor-first focus
Reports are written for decision-making, not technical jargon. -
Early risk detection
Issues are flagged before they turn into delays or cost overruns.
How Pricing Is Determined
- Final pricing is based on:
- Project size and complexity
- Construction stage
- Site location in Bali
- Required reporting frequency
- This ensures fair, transparent pricing aligned with actual project needs.
STRATEGIC ADVISORY MODULES (ADD-ONS)
Multi-Discipline Coordination & Investor Representation (PACK / MDCI)
Purpose
To align architects, engineers, and contractors under one independent technical authority. SUPERPOSE
Scope
Cross-discipline technical coordination
-
Clash & superposition prevention
-
Feasibility control of design decisions
-
Structured coordination meetings
-
Investor representation (non-executive)
-
Responsibility boundary clarification
Fee
USD 2,500 – 6,000 / monthor
1% – 2% of project value(Minimum USD 7,500 – 10,000)
ADDITIONAL ADVISORY MODULES
Module Description Fee Range
For investors who require expert input beyond monitoring and reporting, QMAC offers optional advisory services based on architectural and engineering expertise originating from MacCreative.
These services are independent, non-obligatory, and fully aligned with investor interests.
QMAC/M/ AAD
Architectural Advisory Design decision validation
(Interior & Exterior)
Independent review and guidance on architectural and interior design decisions to ensure functionality, cost efficiency, and long-term investment value.
Includes:
A1/ Review of architectural and interior concepts
A2/ Design efficiency and usability feedback
A3/ Alignment with budget and construction realities
A4/ Recommendations to improve rental or resale value
USD 2,000 – 5,000
QMAC/M/ MSA
Material Selection Advisory Durability & lifecycle cost
Objective guidance on material choices to balance quality, durability, cost, and availability.
Includes:
M1/ Evaluation of proposed materials
M2/ Quality vs. cost comparison
M3/ Suitability for Bali climate and usage
M4/ Identification of unnecessary cost escalations
USD 1,500 – 4,000
QMAC/M/ IAC
Insulation Advisory Climate & energy performance
USD 1,000 – 3,000
QMAC/M/ TSR
Technical Superposition Review Clash prevention
USD 3,000 – 8,000
QMAC/M/ TSAD
Timeline & Scheduling Advisory Delay risk reduction
USD 1,000 – 3,000
QMAC INTEGRATED DELIVERY CONTROL
Multi-Discipline Coordination & Investor Representation
Duration
• Monthly engagement
• Minimum: 3 months
Timing
• Starts once multiple parties (architect, engineer, contractor) are engaged
• Continues through active coordination phases
QMAC does not replace architects, engineers, or contractors.
QMAC operates as an independent quality, coordination, and investment protection authority, supported by MacCreative Group's 19+ years of architectural and engineering expertise.
ADDITIONAL ADVISORY MODULES
Duration
• 1 – 3 weeks per module
Timing
• Activated at specific decision points
• Can be used independently or alongside core packages
VISUAL SUGGESTION (WEB)
Bu bölümü Pricing sayfasında paketlerin altına veya ayrı bir "Timeline & Duration" bölümü olarak eklemeni öneririm.
Örnek kısa cümle (web için):
QMAC services are activated at different stages of your project — from land selection to final delivery.
- 7/24 Emergency site visit
- CMA/ Contractor or consultant meeting attendance
- MAS/ Material approval support
- TOR/ Technical opinion reports
- Pi/ Pre-handover inspection
- RABP/ Risk assessment before next construction phase

Not Sure Which Package Is Right for You?
Choosing the wrong level of oversight can be costly.
Let us review your project and recommend the most effective monitoring solution — with no obligation.
